How to Prepare for Installation 

Getting your site prep, obtaining the permit if it is needed, calling 811 for utility lines are the main things that need to be done before installation.  

Step 1: Make sure to call 811 if  you are insure about utility lines

Step 2: Measure the width of your carport and place stakes accordingly.  Square up stakes as necessary.

Step 3: Run string between stakes and apply string level

Step 4: Record elevation changes, subtract your shortest measurement from the highest and you'll have how many inches off level the land is. ( must be within 4")

​

Utility Information

Please call 811 prior to your installation to ensure site is free of any utility lines

  • We are unable to install any structure under low hanging power lines due to safety hazards.

  • Underground lines such as Internet, gas, poser, sewage or water lines. 

Note:

All buildings require a minimum of 4' open space around the perimeter of the work site, to allow space for ladders and crew.  If a lift is required, a 30' perimeter around the buildings is needed for installation. 

Site Leveling
 